Difference between revisions of "Team Learning-01"

From ADempiere
Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.
(Sign up for Team Learning)
(Update status)
Line 10: Line 10:
 
-- [[User:Peanutblake|Peanut Blake]] Jan 03, 2010.
 
-- [[User:Peanutblake|Peanut Blake]] Jan 03, 2010.
  
==General==
+
 
===Background===
+
Chinese Team is already created and doing team learning now. Hope International Team will be coming soon. :-)
 +
 
 +
-- [[User:Peanutblake|Peanut Blake]] Feb 10, 2010.
 +
 
 +
=General=
 +
==Background==
 
* The Manufacturing Module integrated in ADempiere is a proven function in real cases. This is distinctive in open source ERPs.
 
* The Manufacturing Module integrated in ADempiere is a proven function in real cases. This is distinctive in open source ERPs.
 
* But it is very difficult to learn due to lack of documents and the complexity of manufacturing itself. It really frustrates lots of people who wish to learn it and use in their real cases.
 
* But it is very difficult to learn due to lack of documents and the complexity of manufacturing itself. It really frustrates lots of people who wish to learn it and use in their real cases.
 
* However, if we are united, through team learning, we will do it easier and faster.
 
* However, if we are united, through team learning, we will do it easier and faster.
  
===Introduce===
+
==Introduce==
 
* This project is to form a team to carry out systematic learning on ADempiere's Manufacturing Module.
 
* This project is to form a team to carry out systematic learning on ADempiere's Manufacturing Module.
* This project will be carried out both in English and in Chinese. Synchronization will be done every week.
+
* This project will have 2 teams.
 +
** Chinese Team.
 +
*** Chinese team has been created, team learning has been processing.
 +
*** See here for details - [[ZH/Case-Study-02|Manufacturing Module - Team Learning - Chinese Team]]  ( written in Chinese, you can read it by [http://translate.google.com/ Google Translate]
 +
** International Team.
 +
*** This team will use English.
 +
* The two teams will operate separately.
  
===Time line===
+
==Time line==
* Current phase: Scheme discussion.
+
* Current phase: Team member sign up.
* Team Learning will start around Jan 25, 2011.
+
* Team Learning will start when we have 4 team members, hope we can start around Mar 2011.
 
* Project created: Jan 03, 2011.
 
* Project created: Jan 03, 2011.
==How to Participate==
+
 
 +
=How to Participate=
 
* If you want to join the team, you can sign up below or sent an email to peanutblake <at> yahoo. com.
 
* If you want to join the team, you can sign up below or sent an email to peanutblake <at> yahoo. com.
 
** At least 4 hours per week is required, for team learning and self-directed learning.
 
** At least 4 hours per week is required, for team learning and self-directed learning.
Line 31: Line 43:
 
** Writing an email to discuss. Currently is peanutblake <at> yahoo. com.
 
** Writing an email to discuss. Currently is peanutblake <at> yahoo. com.
  
===Roles in Team===
+
==Roles in Team==
 
# Teacher:1~2 person. In charge of giving guidance for team learning.
 
# Teacher:1~2 person. In charge of giving guidance for team learning.
 
# Coordinator:1 person. In charge of co-ordination.
 
# Coordinator:1 person. In charge of co-ordination.
Line 39: Line 51:
 
# Translator:1~2 person. In charge of translation between English and Chinese.
 
# Translator:1~2 person. In charge of translation between English and Chinese.
  
===Sign up for Team Learning===
+
==Sign up for Team Learning==
 
* Your name ...  
 
* Your name ...  
 
* What kind of '''role''' you want to be ...
 
* What kind of '''role''' you want to be ...
Line 45: Line 57:
 
* What you are interested ...  
 
* What you are interested ...  
  
 
+
===#01 Peanut Blake===
 
* I am [[User:Peanutblake|Peanut Blake]]
 
* I am [[User:Peanutblake|Peanut Blake]]
 
* I want to join as role: Theory Analyzer.
 
* I want to join as role: Theory Analyzer.
Line 51: Line 63:
 
* I will do my best from the view of the manufacturing operation and function usage.
 
* I will do my best from the view of the manufacturing operation and function usage.
  
 +
===#02 Suman===
 +
* I am Suman
 +
* I want to join as role: Code Analyzer.
 +
* I want to join in phase: Phase 1 to Phase 4.
 +
* I am good at analyzing code and connecting the items.
 +
* I Can spend 4 hours in one Weak. Looking forward to see the Chineese Scenario document in english
 +
 +
===#03 You can sign up here===
 +
* I am  ...
 +
* I want to join as role: ...
 +
* I want to join in phase: ...
 +
* I ...
 +
 +
===#04 You can sign up here===
 
* I am  ...  
 
* I am  ...  
 
* I want to join as role: ...  
 
* I want to join as role: ...  
Line 56: Line 82:
 
* I ...
 
* I ...
  
==Outline==
+
=Outline=
 
* '''Purpose''':Master ADempiere's Manufacturing Module and apply it in real case.
 
* '''Purpose''':Master ADempiere's Manufacturing Module and apply it in real case.
 
* '''Scope''':Core functions of ADempiere Manufacturing Module.
 
* '''Scope''':Core functions of ADempiere Manufacturing Module.
Line 64: Line 90:
 
*# '''Focusing on core function'''. Don't waste to much time on unimportant function or development. Otherwise it will make this project too long to control.
 
*# '''Focusing on core function'''. Don't waste to much time on unimportant function or development. Otherwise it will make this project too long to control.
 
*# '''Coincide Environment'''. For example, some functions may be different between version 3.5.4a and 3.6.0LTS.
 
*# '''Coincide Environment'''. For example, some functions may be different between version 3.5.4a and 3.6.0LTS.
===Coincide Environment===
+
==Coincide Environment==
 
* '''ADempiere ERP''': Version 3.6.0LTS.
 
* '''ADempiere ERP''': Version 3.6.0LTS.
 
* '''JVM''': sun-java-1.6.0.
 
* '''JVM''': sun-java-1.6.0.
Line 70: Line 96:
 
* '''Database''': suggest to use PostgreSQL 8.0 or above.
 
* '''Database''': suggest to use PostgreSQL 8.0 or above.
  
==Scheme==
+
=Scheme=
  
 
* '''Duration''': 40 weeks.
 
* '''Duration''': 40 weeks.
Line 76: Line 102:
  
 
===Phase 1-Manufacturing Theory===
 
===Phase 1-Manufacturing Theory===
* '''Manufacturing Theory'''. 6 weeks
+
* '''Manufacturing Theory'''. 8 weeks
** Basic terminology: BOM, workflow, ...
+
** Basic terminology: Item, BOM, workflow, ...
** Core module: MRP, CRP, ...
+
** Core module: MPS, MRP, CRP, ...
  
 
===Phase 2-Basic Function of Manufacturing Module===
 
===Phase 2-Basic Function of Manufacturing Module===
Line 102: Line 128:
 
* '''Standard Costing Management'''. 4 weeks
 
* '''Standard Costing Management'''. 4 weeks
  
==Suggested Reading==
+
=Suggested Reading=
 
# ''Production and Operation Analysis - Sixth Edition''. Stevn Nahmias.  
 
# ''Production and Operation Analysis - Sixth Edition''. Stevn Nahmias.  
 
# [[Libero]] - General list.
 
# [[Libero]] - General list.
Line 108: Line 134:
 
# [[A Step by Step Guide to Libero Manufacturing]]. from Kittiu.
 
# [[A Step by Step Guide to Libero Manufacturing]]. from Kittiu.
  
==Let's Discuss==
+
=Let's Discuss=
 
Hi, let's discuss it here.
 
Hi, let's discuss it here.
  

Revision as of 00:38, 10 February 2011

Manufacturing Module - ADempiere Team Learning 01

Dear all,

I am going to launch a team learning on ADempiere Manufacturing Module.

Please feel free to comment or join. Any suggestions or questions are welcome. :-)

This idea is first initiated from a Case Study in Chinese , so I need a few days to translate it.

-- Peanut Blake Jan 03, 2010.


Chinese Team is already created and doing team learning now. Hope International Team will be coming soon. :-)

-- Peanut Blake Feb 10, 2010.

General

Background

  • The Manufacturing Module integrated in ADempiere is a proven function in real cases. This is distinctive in open source ERPs.
  • But it is very difficult to learn due to lack of documents and the complexity of manufacturing itself. It really frustrates lots of people who wish to learn it and use in their real cases.
  • However, if we are united, through team learning, we will do it easier and faster.

Introduce

  • This project is to form a team to carry out systematic learning on ADempiere's Manufacturing Module.
  • This project will have 2 teams.
  • The two teams will operate separately.

Time line

  • Current phase: Team member sign up.
  • Team Learning will start when we have 4 team members, hope we can start around Mar 2011.
  • Project created: Jan 03, 2011.

How to Participate

  • If you want to join the team, you can sign up below or sent an email to peanutblake <at> yahoo. com.
    • At least 4 hours per week is required, for team learning and self-directed learning.
  • If you don't want to join the team, you can also participate in these ways:
    • Writing down your comments on wiki pages under the Let's Discuss column.
    • Writing an email to discuss. Currently is peanutblake <at> yahoo. com.

Roles in Team

  1. Teacher:1~2 person. In charge of giving guidance for team learning.
  2. Coordinator:1 person. In charge of co-ordination.
  3. Theory Analyzer:1~2 person. In charge of analysis and deep study in manufacturing theory.
  4. Function Analyzer:2~3 person. In charge of function usage and testing.
  5. Code Analyzer:2~3 person. In charge of code analysis.
  6. Translator:1~2 person. In charge of translation between English and Chinese.

Sign up for Team Learning

  • Your name ...
  • What kind of role you want to be ...
  • Which phase you want to joint ...
  • What you are interested ...

#01 Peanut Blake

  • I am Peanut Blake
  • I want to join as role: Theory Analyzer.
  • I want to join in phase: Phase 1 ~ Phase 4.
  • I will do my best from the view of the manufacturing operation and function usage.

#02 Suman

  • I am Suman
  • I want to join as role: Code Analyzer.
  • I want to join in phase: Phase 1 to Phase 4.
  • I am good at analyzing code and connecting the items.
  • I Can spend 4 hours in one Weak. Looking forward to see the Chineese Scenario document in english

#03 You can sign up here

  • I am ...
  • I want to join as role: ...
  • I want to join in phase: ...
  • I ...

#04 You can sign up here

  • I am ...
  • I want to join as role: ...
  • I want to join in phase: ...
  • I ...

Outline

  • Purpose:Master ADempiere's Manufacturing Module and apply it in real case.
  • Scope:Core functions of ADempiere Manufacturing Module.
  • Strategy:
    1. Combining theory and practice. So that you can both know how and know why.
    2. Combining function and case study. We learning the functions with a case study.
    3. Focusing on core function. Don't waste to much time on unimportant function or development. Otherwise it will make this project too long to control.
    4. Coincide Environment. For example, some functions may be different between version 3.5.4a and 3.6.0LTS.

Coincide Environment

  • ADempiere ERP: Version 3.6.0LTS.
  • JVM: sun-java-1.6.0.
  • Operation System: suggest to use Linux, reducing trouble from virus or Trojan.
  • Database: suggest to use PostgreSQL 8.0 or above.

Scheme

  • Duration: 40 weeks.
  • Scheme Discussion: 2~3 weeks.

Phase 1-Manufacturing Theory

  • Manufacturing Theory. 8 weeks
    • Basic terminology: Item, BOM, workflow, ...
    • Core module: MPS, MRP, CRP, ...

Phase 2-Basic Function of Manufacturing Module

  • General scope on ADempiere's Manufacturing Module. 2 weeks
  • Engineering Management. 6 weeks
    • BOM. 2 weeks
    • Resource. 2 weeks
    • Manufacturing Workflow.2 weeks
  • Production Management. 4 weeks
    • Manufacturing Order

Phase 3-Planning Management of Manufacturing Module

  • Planning Management.8 weeks
    • Product Planning. 1 week
    • Forecast. 1 week
    • Material Requirement Planning. 3 weeks
    • Capacity Requirement Planning. 2 weeks
    • Distribution Resource Planning. 1 week

Phase 4-Other Functions of Manufacturing Module

  • Distribution Management. 4 weeks.
  • Quality Management. 2 weeks
  • Standard Costing Management. 4 weeks

Suggested Reading

  1. Production and Operation Analysis - Sixth Edition. Stevn Nahmias.
  2. Libero - General list.
  3. Libero-MFG-alpha User Manual. Nice manual in PDF format.
  4. A Step by Step Guide to Libero Manufacturing. from Kittiu.

Let's Discuss

Hi, let's discuss it here.

Links