Difference between revisions of "Talk:Testing Maintenance Management functionality based on Libero Manufacturing"
(→24 May 2009 Interested?) |
|||
Line 1: | Line 1: | ||
− | = | + | =31 May 2009= |
− | + | Hi, | |
− | + | ||
− | + | I have full [http://osbs.wik.is/@api/deki/files/51/=Map_PM_Mercedes_(Russian).doc Card of planned maintenance service of cars Mercedes-Benz 220, 210, 211, 203, 202, 140, 168(Russian)]. | |
− | + | ||
− | + | But I created the simple card for this test. | |
− | + | I think we should create three BOMs for Preventive Maintenance: | |
− | ** | + | * Preventive Maintenance 1 - through each 15 000 km |
− | * | + | * Preventive Maintenance 2 - through each 30 000 km |
− | + | * Preventive Maintenance 3 - through each 60 000 km | |
− | : - [[User: | + | |
+ | What do you think about it? | ||
+ | : - [[User:pshepetko|Peter Shepetko]] 12:26, 31 May 2009 (GMT+2:00) | ||
+ | |||
=26 May 2009= | =26 May 2009= | ||
Line 29: | Line 32: | ||
: - [[User:pshepetko|Peter Shepetko]] 12:32, 26 May 2009 (GMT+2:00) | : - [[User:pshepetko|Peter Shepetko]] 12:32, 26 May 2009 (GMT+2:00) | ||
− | = | + | =24 May 2009: Interested?= |
− | Hi | + | *Hi Victor and Peter. I am also interested in such a system for a prospect and wonder if our ideas are the same: |
− | + | **Each maintenance event is a BOM comprising of say: | |
− | I | + | ***Spare parts |
− | + | ***Labour charges | |
− | + | **I intend to use the old simple BOM concept from Compiere. | |
− | + | *Questions: | |
− | * | + | **Can the new PP_BOM do this as easily as the old BOM? |
− | * | + | **What extras can we have in the new system? |
− | * | + | *If it is the same, then we can assist in design, development and testing. |
− | + | : - [[User:Red1|Red1]] 18:28, 24 May 2009 (PDT) | |
− | What | + | |
− | : - [[User: | + |
Revision as of 00:44, 1 June 2009
31 May 2009
Hi,
I have full Card of planned maintenance service of cars Mercedes-Benz 220, 210, 211, 203, 202, 140, 168(Russian).
But I created the simple card for this test. I think we should create three BOMs for Preventive Maintenance:
- Preventive Maintenance 1 - through each 15 000 km
- Preventive Maintenance 2 - through each 30 000 km
- Preventive Maintenance 3 - through each 60 000 km
What do you think about it?
- - Peter Shepetko 12:26, 31 May 2009 (GMT+2:00)
26 May 2009
Hi Red1,
We will use resource for Maintenance Management :
- Material - Material transaction costs (e.g. spare parts).
- Labor - Labor resource transaction costs (e.g. mechanic for car).
- Equipment - Equipment resource transaction costs (e.g. diagnostics stand).
I think you should use Libero BOM (Multi Level BOM&Formula) if you use Libero MFG. But if you want to create a simple assemblage (e.g. Patio Furniture Set - 1 table, 4 Chairs and 1 Sun Screen) – use standard BOM. Yes, new PP_BOM this as easily as the old BOM.
I think, we should start to test it and add new functionality (e.g. meter readings) and we should check(or create) integration with other modules(e.g. Assets), because about 75 % of functionality (BOM, Forecast, MRP, MPS, CRP and etc.) is in Libero MFG.
What does Victor think about it?
- - Peter Shepetko 12:32, 26 May 2009 (GMT+2:00)
24 May 2009: Interested?
- Hi Victor and Peter. I am also interested in such a system for a prospect and wonder if our ideas are the same:
- Each maintenance event is a BOM comprising of say:
- Spare parts
- Labour charges
- I intend to use the old simple BOM concept from Compiere.
- Each maintenance event is a BOM comprising of say:
- Questions:
- Can the new PP_BOM do this as easily as the old BOM?
- What extras can we have in the new system?
- If it is the same, then we can assist in design, development and testing.
- - Red1 18:28, 24 May 2009 (PDT)