Difference between revisions of "Talk:Testing Maintenance Management functionality based on Libero Manufacturing"

From ADempiere
Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.
(24 May 2009 Interested?)
Line 1: Line 1:
=24 May 2009: Interested?=
+
=31 May 2009=
*Hi Victor and Peter. I am also interested in such a system for a prospect and wonder if our ideas are the same:
+
Hi,
**Each maintenance event is a BOM comprising of say:
+
 
***Spare parts
+
I have full [http://osbs.wik.is/@api/deki/files/51/=Map_PM_Mercedes_(Russian).doc Card of planned maintenance service of cars Mercedes-Benz 220, 210, 211, 203, 202, 140, 168(Russian)].
***Labour charges
+
 
**I intend to use the old simple BOM concept from Compiere.
+
But I created the simple card for this test.
*Questions:
+
I think we should create three BOMs for Preventive Maintenance:
**Can the new PP_BOM do this as easily as the old BOM?
+
* Preventive Maintenance 1 - through each 15 000 km
**What extras can we have in the new system?
+
* Preventive Maintenance 2 - through each 30 000 km
*If it is the same, then we can assist in design, development and testing.
+
* Preventive Maintenance 3 - through each 60 000 km
: - [[User:Red1|Red1]] 18:28, 24 May 2009 (PDT)
+
 
 +
What do you think about it?
 +
: - [[User:pshepetko|Peter Shepetko]] 12:26, 31 May 2009 (GMT+2:00)
 +
 
  
 
=26 May 2009=
 
=26 May 2009=
Line 29: Line 32:
 
: - [[User:pshepetko|Peter Shepetko]] 12:32, 26 May 2009 (GMT+2:00)
 
: - [[User:pshepetko|Peter Shepetko]] 12:32, 26 May 2009 (GMT+2:00)
  
=31 May 2009=
+
=24 May 2009: Interested?=
Hi,
+
*Hi Victor and Peter. I am also interested in such a system for a prospect and wonder if our ideas are the same:
 
+
**Each maintenance event is a BOM comprising of say:
I have full [http://osbs.wik.is/@api/deki/files/51/=Map_PM_Mercedes_(Russian).doc Card of planned maintenance service of cars Mercedes-Benz 220, 210, 211, 203, 202, 140, 168(Russian)].
+
***Spare parts
 
+
***Labour charges
But I created the simple card for this test.
+
**I intend to use the old simple BOM concept from Compiere.
I think we should create three BOMs for Preventive Maintenance:
+
*Questions:
* Preventive Maintenance 1 - through each 15 000 km
+
**Can the new PP_BOM do this as easily as the old BOM?
* Preventive Maintenance 2 - through each 30 000 km
+
**What extras can we have in the new system?
* Preventive Maintenance 3 - through each 60 000 km
+
*If it is the same, then we can assist in design, development and testing.
 
+
: - [[User:Red1|Red1]] 18:28, 24 May 2009 (PDT)
What do you think about it?
+
: - [[User:pshepetko|Peter Shepetko]] 12:26, 31 May 2009 (GMT+2:00)
+

Revision as of 00:44, 1 June 2009

31 May 2009

Hi,

I have full Card of planned maintenance service of cars Mercedes-Benz 220, 210, 211, 203, 202, 140, 168(Russian).

But I created the simple card for this test. I think we should create three BOMs for Preventive Maintenance:

  • Preventive Maintenance 1 - through each 15 000 km
  • Preventive Maintenance 2 - through each 30 000 km
  • Preventive Maintenance 3 - through each 60 000 km

What do you think about it?

- Peter Shepetko 12:26, 31 May 2009 (GMT+2:00)


26 May 2009

Hi Red1,

We will use resource for Maintenance Management :

  1. Material - Material transaction costs (e.g. spare parts).
  2. Labor - Labor resource transaction costs (e.g. mechanic for car).
  3. Equipment - Equipment resource transaction costs (e.g. diagnostics stand).

I think you should use Libero BOM (Multi Level BOM&Formula) if you use Libero MFG. But if you want to create a simple assemblage (e.g. Patio Furniture Set - 1 table, 4 Chairs and 1 Sun Screen) – use standard BOM. Yes, new PP_BOM this as easily as the old BOM.

I think, we should start to test it and add new functionality (e.g. meter readings) and we should check(or create) integration with other modules(e.g. Assets), because about 75 % of functionality (BOM, Forecast, MRP, MPS, CRP and etc.) is in Libero MFG.

What does Victor think about it?

- Peter Shepetko 12:32, 26 May 2009 (GMT+2:00)

24 May 2009: Interested?

  • Hi Victor and Peter. I am also interested in such a system for a prospect and wonder if our ideas are the same:
    • Each maintenance event is a BOM comprising of say:
      • Spare parts
      • Labour charges
    • I intend to use the old simple BOM concept from Compiere.
  • Questions:
    • Can the new PP_BOM do this as easily as the old BOM?
    • What extras can we have in the new system?
  • If it is the same, then we can assist in design, development and testing.
- Red1 18:28, 24 May 2009 (PDT)