Difference between revisions of "Sponsored Development: Libero Manufacturing Work Shop"
From ADempiere
This Wiki is read-only for reference purposes to avoid broken links.
(→Workflow) |
m (indentation) |
||
Line 53: | Line 53: | ||
− | + | === Warehouse === | |
** HQ Transit | ** HQ Transit | ||
** Furniture | ** Furniture | ||
Line 62: | Line 62: | ||
** Store West | ** Store West | ||
− | + | == New Business Partner == | |
*** Wood, Inc | *** Wood, Inc | ||
*** Color, Inc | *** Color, Inc | ||
Line 68: | Line 68: | ||
*** Chemical Product, inc | *** Chemical Product, inc | ||
− | + | = Discrete Manufacturing = | |
− | + | == New Product Category == | |
* Raw Material | * Raw Material | ||
Line 76: | Line 76: | ||
* Packing | * Packing | ||
− | + | == New UOM == | |
*ml Mililiter | *ml Mililiter | ||
*kg kilogram | *kg kilogram | ||
Line 82: | Line 82: | ||
*L litre | *L litre | ||
− | + | == Product == | |
**** Patio Set UOM EA | **** Patio Set UOM EA | ||
**** Patio Table UOM EA | **** Patio Table UOM EA | ||
Line 94: | Line 94: | ||
**** Back UOM EA | **** Back UOM EA | ||
− | + | == Resource == | |
**** Furniture Plant | **** Furniture Plant | ||
**** Assembly Area | **** Assembly Area | ||
Line 101: | Line 101: | ||
**** Inspection Area | **** Inspection Area | ||
− | + | ==Bill of Material == | |
* Document | * Document | ||
Line 112: | Line 112: | ||
[[Image:ReportDiscreteBOM.png | Report BOM]] | [[Image:ReportDiscreteBOM.png | Report BOM]] | ||
− | + | = Process Manufacturing = | |
− | + | == Product == | |
**** Fertilizer # 50 UOM EA | **** Fertilizer # 50 UOM EA | ||
**** Fertilizer # 70 UOM EA | **** Fertilizer # 70 UOM EA | ||
Line 124: | Line 124: | ||
**** Bag 70 kg | **** Bag 70 kg | ||
− | + | == Resource == | |
**** Fertilizer Plant | **** Fertilizer Plant | ||
**** Packing Production Line | **** Packing Production Line | ||
Line 131: | Line 131: | ||
**** Inspection Area | **** Inspection Area | ||
− | + | == Workflow == | |
[[Image:DiscreteWorkflow.png | Workflow]] | [[Image:DiscreteWorkflow.png | Workflow]] | ||
− | + | == Formula == | |
* Document | * Document | ||
*** [http://www.adempiere.com/wiki/images/2/29/ProcessFormula.pdf] | *** [http://www.adempiere.com/wiki/images/2/29/ProcessFormula.pdf] | ||
Line 146: | Line 146: | ||
[[Image:ReportProcessFolumula.png | Report Formula]] | [[Image:ReportProcessFolumula.png | Report Formula]] | ||
− | + | == Workflow == | |
* Process Mixed | * Process Mixed | ||
Line 156: | Line 156: | ||
[[Image:ProductionLineWorkflow.png | Workflow]] | [[Image:ProductionLineWorkflow.png | Workflow]] | ||
− | + | = Manufacturing Planning = | |
− | + | == Forecast == | |
− | + | == MRP & DRP == | |
− | + | == CRP == | |
==Screen Shot== | ==Screen Shot== |
Revision as of 18:40, 23 September 2008
Contents
Proposal
Create a complete example for Libero Manufacturing Functionality for ADempiere's GardenWorld sample test client.
Project Lead
Coordinator
Requirements
The workshop will be based on the 2 types of Industrial Manufacturing which are: (1) Process (Chemical) and (2) Discrete Manufacturing.
The objectives here are to:
- Create such seed or sample data for ADempiere standard distribution
- Form part of the ongoing Libero Manual or any related documentation.
- To promote to the whole world about the new manufacturing functionality of ADempiere.
- To advance ADempiere as the best open source ERP solution for the Distribution and Manufacturing industry.
The example is based in Garden World Client that now has two new Manufacturing Plans: the first manufacturing furniture for Garden; and the second manufacturing fertilizers in 2 presentation sacks of 70 Kg and 50 kg.
Also Garden work has 4 new stores to distribute the production via distribution network and Distribution Plan.
Functional Specs
Design Manufacturing Environment
Organization
- Furniture Plant
- Fertilizer Plan
- Store North
- Store South
- Store East
- Store West
- The current Store re name for Store Central
Location
Address Furniture Plant Carretera Mexico Pachuca Km 80 Pachuca Hidalgo CP 43000 Mexico
Address Fertilizer Plan Schillerstrabe 18d Múnich PC 47445 Germany
Warehouse
- HQ Transit
- Furniture
- Fertilizer
- Store North
- Store South
- Store East
- Store West
New Business Partner
- Wood, Inc
- Color, Inc
- Chrome, Inc
- Chemical Product, inc
Discrete Manufacturing
New Product Category
- Raw Material
- Assembly
- Packing
New UOM
- ml Mililiter
- kg kilogram
- mg milligram
- L litre
Product
- Patio Set UOM EA
- Patio Table UOM EA
- Patio Screen UOM EA
- Patio Chair UOM EA
- Assembly Back Leg UOM EA
- #6-32 x 3/8 Socket Head Cap Screw UOM EA
- Ultra Glue UOM ML
- Assembly Front Leg UOM EA
- Seat UOM EA
- Back UOM EA
Resource
- Furniture Plant
- Assembly Area
- Paint Area
- Chrome Subcontract Area
- Inspection Area
Bill of Material
- Document
- From BOM
- Report Form
Process Manufacturing
Product
- Fertilizer # 50 UOM EA
- Fertilizer # 70 UOM EA
- Fertilizer UOM KG
- Nitrogen UOM g
- Phosphorus UOM g
- Potassium UOM g
- Whater UOM LT
- Bag 50 Kg
- Bag 70 kg
Resource
- Fertilizer Plant
- Packing Production Line
- Mixed Area
- Dry Area
- Inspection Area
Workflow
Formula
- Document
- From Formula
- Report Formula
Workflow
- Process Mixed
- Packing Process
Manufacturing Planning
Forecast
MRP & DRP
CRP
Screen Shot
Reference
Developers
mailto:victor.perez@e-evolution.com
Testers
mailto:oscar.siebert@gmail.com
mailto:jstangeland@idalica.com
Sponsors