Difference between revisions of "Sponsored Development: Libero Manufacturing Standard Cost"

From ADempiere
Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.
(Functional Specs)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 +
 
=Workaround=
 
=Workaround=
  
Create an complete  example for Libero Functionality
+
The goal is completed the Manufacturing Standard Cost
  
 
=Project Lead=
 
=Project Lead=
Line 11: Line 12:
  
 
==Functional Specs==
 
==Functional Specs==
*Design Manufacturing Environment
 
**Discrete Manufacturing
 
*** Product
 
*** Resource
 
*** Workflow
 
*** BOM
 
**Process Manufacturing
 
*** Product
 
*** Resource
 
*** Workflow
 
*** Formula
 
Manufacturing Planning
 
*** MRP & DRP
 
*** CRP
 
  
 +
=== Multi Level BOM & Formula Roll-Up Cost Report ===
 +
See [http://www.adempiere.com/wiki/images/f/f6/MultiLevelCostBOM.pdf Multi Level BOM & Formula Roll-Up Cost Report]
 +
 +
=== Workflow Roll-Up Cost Report ===
 +
See [http://www.adempiere.com/wiki/images/8/8e/WorkflowCostReport.pdf Workflow Roll-Up Cost Report]
 +
 +
=== Manufacturing Order Standard Cost ===
 +
 +
=== Manufacturing Order Cost Variances ===
  
 
==Screen Shot==
 
==Screen Shot==
Line 37: Line 33:
 
mailto:victor.perez@e-evolution.com
 
mailto:victor.perez@e-evolution.com
  
 +
mailto:teo.sarca@gmail.com
  
 
==Testers==
 
==Testers==
mailto:oscar.siebert@gmail.com
+
mailto:teo.sarca@gmail.com
mailto:jstangeland@idalica.com
+
  
 
==Sponsors==
 
==Sponsors==
 
[http://e-evolution.com e-Evolution]
 
[http://e-evolution.com e-Evolution]
  
 +
[http://www.arhipac.ro Arhipac]
  
 
=Installation in Production=
 
=Installation in Production=

Latest revision as of 00:11, 8 September 2009

Workaround

The goal is completed the Manufacturing Standard Cost

Project Lead


Coordinator

Functional Specs

Multi Level BOM & Formula Roll-Up Cost Report

See Multi Level BOM & Formula Roll-Up Cost Report

Workflow Roll-Up Cost Report

See Workflow Roll-Up Cost Report

Manufacturing Order Standard Cost

Manufacturing Order Cost Variances

Screen Shot

Reference

Developers

mailto:victor.perez@e-evolution.com

mailto:teo.sarca@gmail.com

Testers

mailto:teo.sarca@gmail.com

Sponsors

e-Evolution

Arhipac

Installation in Production