Difference between revisions of "Sponsored Development: Libero Distribution Resource Planning"
From ADempiere
This Wiki is read-only for reference purposes to avoid broken links.
Line 39: | Line 39: | ||
==Reference:== | ==Reference:== | ||
+ | |||
+ | [http://en.wikipedia.org/wiki/Distribution_Resource_Planning Distribution Resource Planning] | ||
+ | [http://en.wikipedia.org/wiki/Manufacturing_resource_planning Manufacturing Resource Planning] | ||
+ | [http://www.adempiere.com/wiki/index.php/Libero Libero MRP II to ADempiere] | ||
+ | [http://www.businessdictionary.com/definition/distribution-resource-planning-DRP-II.html Distribution Resource Planning] | ||
[[Category:Development]] | [[Category:Development]] | ||
[[Category:Features]] | [[Category:Features]] |
Revision as of 19:19, 14 October 2007
Contents
Project Team
Coordinator
Functional Disaing
- Victor Perez (contribute with work) of e-Evolution
Developers
- Victor Perez (contribute with work) of e-Evolution
Testers
- Victor Perez (contribute with work) of e-Evolution
Sponsors
others welcome
Requirements
Distribution Resource Planning (DRP) is a method used in business administration for planning orders within a supply chain. DRP enables the user to set certain inventory control parameters (like a safety stock) and calculate the time-phased inventory requirements.
DRP uses several variables:
- the on-hand inventory at the end of a time period.
- the backordered demand at the end of a time period.
- the required quantity of product needed at the beginning of a time period.
- the constrained quantity of product available at the beginning of a time period.
- the recommended order quantity at the beginning of a period.
DRP needs the following information:
- the demand in a future time period.
- the scheduled receipts at the beginning of a time period.
- the safety stock requirement for a period.
- the on-hand inventory at the beginning of a period.
Reference:
Distribution Resource Planning Manufacturing Resource Planning Libero MRP II to ADempiere Distribution Resource Planning