Difference between revisions of "ManPageR ProjectCycleReport"
From ADempiere
This Wiki is read-only for reference purposes to avoid broken links.
(Initial load of Online Help) |
(Added version and category) |
||
Line 6: | Line 6: | ||
under the [[#Contributions|Contributions]] Section | under the [[#Contributions|Contributions]] Section | ||
− | <!-- Note to editors: | + | <!-- Note to editors: DON'T MODIFY THIS CODE --> |
− | {{:ManPageR_ProjectCycleReport_olh}} | + | {{:Adempiere{{CURRENTMANUALVERSION}}/en/ManPageR_ProjectCycleReport_olh}} |
− | <!-- END Note to editors: | + | <!-- END Note to editors: DON'T MODIFY THIS CODE --> |
=Contributions= | =Contributions= | ||
+ | |||
+ | [[Category:Manual|R P]] |
Latest revision as of 12:57, 14 December 2006
Enjoy it, and help to fill it! But please, always respecting copyright.
Please write your contributions under the Contributions Section
Report: Project Cycle Report
Description : Report Projects based on Project Cycle
Help : The Project Cycle reports on common project phases of a Cycle Step/Phase. All Report information is weighted by the relative weight of the Cycle Step and converted to the currency of the Project Cycle (e.g. for Sales Funnel Reporting).The Projects must have a Project Type, Phase and Currency defined. The Phase must be assigned to a Cycle Step. ReportView Name: RV_ProjectCycle
Parameters
Name | Description | Help | Technical Data |
---|---|---|---|
Project Cycle | Identifier for this Project Reporting Cycle | Identifies a Project Cycle which can be made up of one or more cycle steps and cycle phases. | C_Cycle_ID
TableDir
|