Difference between revisions of "A Step by Step Guide to Libero Manufacturing"

From ADempiere
Jump to: navigation, search
This Wiki is read-only for reference purposes to avoid broken links.
m (Manufacturing Workflow)
(Manufacturing Resources)
Line 8: Line 8:
 
==== Manufacturing Resources ====
 
==== Manufacturing Resources ====
 
*The '''Resource Type''' is used to calculate the available time in a Manufacturing Resource. It allows input of starting time and end time for the slot according to the working days.
 
*The '''Resource Type''' is used to calculate the available time in a Manufacturing Resource. It allows input of starting time and end time for the slot according to the working days.
 +
*The '''Planning Horizon''' in Manufacturing resources is used for ???
  
 
==== Manufacturing Workflow ====
 
==== Manufacturing Workflow ====
 
*If the workflow name is the same as the product name this Workflow will be the default Workflow for the product.
 
*If the workflow name is the same as the product name this Workflow will be the default Workflow for the product.
 
*The time constraint (i.e., Queuing Time, Waiting Time) in Manufacturing WF and Manufacturing Resource is different in that = ????
 
*The time constraint (i.e., Queuing Time, Waiting Time) in Manufacturing WF and Manufacturing Resource is different in that = ????

Revision as of 01:17, 4 November 2010

This page is under construction --Kittiu 16:18, 20 September 2010 (UTC)

Overview

This page is based on the attempt to understand ADempiere Libero Manufacturing module of the author. It will be illustrated as a step by step guide for the reader to have the FEEL of what Libero Manufacturing can do and how to do it. I am referring to the Manufacturing Management workshop conducted by Victor Perez some time back in 2009.

As such, this is by no mean the as the reference manual of Manufacturing Management in ADempiere and you can always find more reference from the original source in LIBERO

Notes

Manufacturing Resources

  • The Resource Type is used to calculate the available time in a Manufacturing Resource. It allows input of starting time and end time for the slot according to the working days.
  • The Planning Horizon in Manufacturing resources is used for ???

Manufacturing Workflow

  • If the workflow name is the same as the product name this Workflow will be the default Workflow for the product.
  • The time constraint (i.e., Queuing Time, Waiting Time) in Manufacturing WF and Manufacturing Resource is different in that = ????